There is an Agent.sg user associated with the entered mobile number but with a different email address. Log in to this Agent.sg profile or use the entered email address!
- Limited units
- Ramp Up Factory
- Business 2 usage (General Industries)
- Roller shuttles provided
- Able to park 3 lorries in front of the unit
- 20 ft container ramp up access
- 20 / 40 ft loading bay at ground floor
- 6m floor to ceiling height
- 12.5 kn/m2 to 15 kn/m2 loading
- 60 to 700 A (3 phases)
Tuas area will be undergoing mega transformation in the next 5-10 years.
Improved connectivity. Travelling to Tuas will be a breeze !
- MRT Tuas West extension will be ready for service in 2Q 2017
- Tuas Viaduct will be opened on 18 Feb 2017
*****
- Near to 2nd link, easy access to Malaysia hinterland
- Future Mega Port / Integrated Shipyard
MNCs from marine, biomedical, pharmaceutical, oil & gas industries require many supporting trades. Rental demand will be hot !